Conditional Bid/No-Bid Brief
Solicitation SP451026Q1015: DLA Southeast-region warehouse cleaning across Fort Bragg, Eglin AFB, Camp Lejeune, and Warner Robins AFB.
View the controlling public SAM.gov record →
Executive decision
No-bid unless every hard gate below is already satisfied. If all gates pass, escalate immediately to a priced bid review.
This is not ordinary local janitorial work. It is a five-year potential, firm-fixed-price IDIQ for annual warehouse cleaning across four military installations in North Carolina, Florida, and Georgia. The work includes ceilings up to 50 feet, thousands of feet of piping, warehouse racks, walls, windows, concrete floors, military-base access, site-specific wastewater handling, and strict quality controls.
A credible bidder should be an eligible SDVOSB—or have a compliant eligibility and teaming structure confirmed—with multi-state operating capacity, relevant high-bay warehouse experience, qualified lift and fall-protection operations, accessible past-performance references, and enough estimating discipline to absorb differing site conditions into fixed per-square-foot prices.
Opportunity snapshot
| Buyer | Defense Logistics Agency Disposition Services |
|---|---|
| Requirement | Southeast-region warehouse cleaning |
| NAICS | 561720 |
| Contract form | Firm-fixed-price IDIQ |
| Term | One 12-month base period plus four 12-month options |
| Pricing unit | Per square foot, separately by site and period |
| Set-aside signal | Service-Disabled Veteran-Owned Small Business |
| Source package reviewed | Eight files: solicitation clauses, past-performance material, amendment, price schedule, QASP, Q&A, scanned wage determinations, and performance work statement |
Seven hard gates
- Eligibility: Is the bidding entity eligible for the SDVOSB set-aside and able to comply with applicable limitations on subcontracting?
- Geography: Can it self-perform or compliantly team across Fort Bragg, Eglin AFB, Camp Lejeune, and Warner Robins AFB?
- High-work capability: Can it safely clean ceilings and structures at heights of 30–50 feet with contractor-provided lifts, PPE, and fall-protection systems?
- Past performance: Can it identify relevant projects and get customer references to return the required questionnaires directly to DLA before closing?
- Labor compliance: Can its price absorb site-specific Service Contract Labor Standards wages, fringe benefits, paid leave, holidays, payroll burden, supervision, and travel?
- Fixed-price risk: Can it price each site per square foot while absorbing equipment, labor, products, access delays, wastewater handling, and uncertain actual-versus-estimated space?
- Submission certainty: Can it confirm the exact quotation volumes, delivery method, amendment acknowledgment, and closing timestamp from the live record?
Site scope and minimum labor floors
| Site | Floor area | High-work notes | Base + fringe floor* |
|---|---|---|---|
| Bragg, NC | 44,365 sq ft | Ceiling to 40 ft; 500 ft piping | $20.94/hr |
| Eglin, FL | 68,988 sq ft | Ceilings to 40 ft; 6,435 ft piping total | $21.76/hr |
| Lejeune, NC | 89,000 sq ft | Ceilings to 30 ft; 3,000 ft piping | $19.51/hr |
| Warner Robins, GA | 143,533 sq ft | Ceiling to 50 ft; 1,200 ft piping | $20.47/hr |
*Before payroll taxes, workers’ compensation, supervision, overtime, paid holidays or vacation, travel, lodging, equipment, consumables, wastewater handling, overhead, and profit. Figures in the demonstration were visually checked against the package’s scanned wage tables and benefits sections. Current bidders must verify the controlling wage determinations themselves.
Material operating risks
Unguaranteed multi-site volume
The Government may not order every site each year. The IDIQ minimum is only $2,000, with no option-period minimum. A bidder should not price as though all four mobilizations are guaranteed.
Fall protection and lift cost
The Government does not provide high-level tie-off systems. Contractor responsibility is explicit at three locations, while Eglin expects lift-based access.
Different wastewater rules
- Eglin reports an available drain.
- Bragg requires environmentally safe solution suitable for site drainage.
- Lejeune provides sanitary or wash-out access for non-hazardous, pH-neutral material.
- Warner Robins expects the contractor to capture and haul wastewater off-site.
Installation access
Credentialing differs by installation, creating different lead times and operational dependencies. Those delays belong in the price and schedule.
Past-performance dependency
DLA must receive reference questionnaires directly. This creates a deadline dependency outside the bidder’s direct control.
Submission checklist
- Verify SDVOSB eligibility and subcontracting limits
- Open the live SAM.gov record and confirm all amendments
- Confirm exact quotation volumes, contents, delivery method, and closing timezone
- Acknowledge the controlling amendment
- Complete the amended price schedule with the required decimal format
- Send past-performance questionnaires to references early
- Build a site-specific labor, equipment, travel, access, and wastewater model
- Price options independently without assuming all sites or years will be ordered
- Prepare post-award quality-control and invoicing capability
Immediate no-bid conditions
- The entity is not eligible for the set-aside.
- Relevant references cannot respond before closing.
- The bidder lacks compliant coverage at all four locations.
- High-bay lift and fall-protection operations are not routine capabilities.
- The bidder cannot model site-specific wage and fringe obligations.
- The bidder needs guaranteed volume to recover mobilization cost.
- Submission mechanics cannot be confirmed before the deadline.
Unresolved questions
- What are the exact quotation-volume requirements and page or file constraints?
- What is the controlling electronic submission method and address?
- Does the live record contain a later amendment than the eight-file package reviewed?
- Which labor classifications beyond Janitor apply to lift operators, supervisors, and wastewater handling?
- What was the historical order volume under the predecessor contract?
- What insurance, vehicle, and installation-specific credential costs should be included?
- Are site visits available or already completed?
Confidence and limits
High confidence on physical scope, locations, pricing structure, quality requirements, wage-floor components, and operating risks because they appeared directly in the downloaded work statement, Q&A, amendment, price schedule, quality plan, clauses, and wage determinations.
Moderate or low confidence on complete submission compliance because the extracted package did not clearly establish every quotation-volume and delivery instruction. The live solicitation and amendment register remain controlling.
Get this level of analysis for your opportunity.
One mutually accepted public federal solicitation package, tailored to your stated capabilities, for $199.